The Processing of Seamless Steel Pipe (4)
pipe connection: After the plastic repair is completed, the pipe and the pipe fittings are connected and installed. During the connection process, rubber pads are added between the flanges, and the bolts are tightened to the sealed state.
Changsha Xiangjia Metal Materical Co., Ltd. the Steel Pipe Division of ADTO GROUP, is one of the leading manufacturers of steel products in China. We specializes in manufacturing all kinds of steel pipe in various grades and sizes. Years of production experience and manufacturing facilities who have a capacity of 200,000 tons per annual will ensure the good quality and competitive duration of our products.