High Temperature Painting - SSAW Steel Pipe

High-temperature paint construction process of SSAW steel pipe: First, the surface of spiral welded pipe material should be degreasing, rust and dirt treatment before construction to improve the adhesion of the paint film. The humidity of the metal surface should be 3°C higher than the dew point during construction.


The second is to stir the paint evenly before use, which can be carried out by conventional methods such as brushing and spraying. When spraying, a high-temperature special thinner must be used, the dilution amount is 5-15% (based on the paint weight), the nozzle diameter is 1.5-2.0mm, and the air pressure is 0.3-0.4MPa.


Finally, it is recommended to brush or spray 1-2 procedures for SSAW steel pipe.


Changsha Xiangjia Metal Materical Co., Ltd. the Steel Pipe Division of ADTO GROUP, is one of the leading manufacturers of steel products in China. We specializes in manufacturing all kinds of steel pipe in various grades and sizes. Years of production experience and manufacturing facilities who have a capacity of 200,000 tons per annual will ensure the good quality and competitive duration of our products.