PROJECT: ENGINEERING, PROCUREMENT & CONSTRUCTION(EPC) TURNKEY"CONTRACT PACKAGE No. KIV-PS(PUMPING STATIONS 2x130MGD)
Date: 02/07/2024
Client: Descon Engineering Limited
1. Introduction:
This project is for Greater Karachi Bulk Water Supply Scheme KIV - PS 2x130 MGD pumping stations.
2. Products: SSAW steel pipes and SMLS steel pipes, 4/6/12 meters Length, inner and outer FBE 500um coating with UV resistant coat,PE/BE ends, hanging straps, cross bracing water-proof packing materials
Φ2133*15.90*12000mm
Φ1828*15.90*12000mm
Φ1626*15.90*12000mm
Φ1422*9.50*12000mm
Φ1016*9.50*12000mm
Φ914*9.50*12000mm
Φ812*9.50*12000mm
Φ610*9.50*12000mm
Φ323.90*9.50*12000mm
Φ168.30*7.11*12000mm
Φ101.60*6.01*6000mm
Φ88.90*5.50*6000mm
Φ60.30*3.90*6000mm
Φ33.40*3.40*4000mm
Φ21.30*3.70*4000mm
QTY:554MT
Spec.: Steel to specification of API 5L GR.X42 PSL2 Coating: inner and outer FBE 500um coating with UV resistant coat
TPI: TUV SGS
3. Production Schedule